contact us

ELECTRICAL CONTROL

At Sewtec we take pride in delivering a complete solution to meet our customers’ requirements. We are self-sufficient when it comes to integrating electrics and control systems in our machinery.

Our highly experienced design and assembly engineers, working with the latest computer software, have all the resources they need to take total control of a project.  We do not need to rely upon outsourced suppliers for electrical design and manufacture.

First, we listen to our customers to build a clear understanding of what they need the machinery to achieve.

Our electrical control engineers then produce a comprehensive design and detail package, complete with schematics, panel and machine wiring layouts, bills of materials and terminal layouts.

All electrical drawings are produced on an Autocad system which is linked to our in-house work tracking system for bills of materials, creating excellent records and component  part traceability.

Our electrical engineers work  closely with our customer and our nominated project  manager from the early stage of every project.

Electrical control panels are assembled and tested by Sewtec electrical engineers on our own premises in a purpose-designed department working to the latest electrical standards.